PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing shear wall panels at Stair -2-Elev. 4 (4th Floor) Facing South-West (800x600).jpg Rebar mats at Elev. 1,2,3 (4th Floor) Facing South-West (800x600).jpg Unbolting the shear wall panels at Stair -4 (3rd Floor) Facing North-East (800x600).jpg Compacting the Locker rooms Facing West (800x600).jpg Excavation at Rahway Ave. (800x600).jpg
Next page Installing shear wall panels at Stair -2-Elev. 4 (4th Floor) Facing South-West (800x600)
Installing shear wall panels at Stair -2-Elev. 4 (4th Floor) Facing South-West (800x600)